IMPROVEMENT OF THE AFFORDABLE HOUSING PRECAST AND 

PRECAST-CAST-IN-PLACE BUILDING PRODUCTION TECHNOLOGIES 

 
Introduction. 
The problem of the resource-saving buildings erection remains 

relevant in the construction industry to date. Among the reasons for its existence should 
be noted the use of imperfect constructive systems and labor-intensive technological 
processes of work, a low mechanization level of technological processes for the 
production of building structures and materials, a high level of buildings material 
consumption, the use of outdated architectural and planning solutions. All this 
contributes to the exacerbation of the social problem, which is manifested in the 
inaccessibility of comfortable housing for a large part of the Ukraine population 
because of its high cost. It is especially acute in the conditions of the population.  

One of the ways to solve this problem is to improve the process of erecting 

residential buildings through technical measures, in particular, introducing into the 
technology of their erection effective frame structural systems made of reinforced 
concrete, which are characterized by both a minimum set of prefabricated elements and 
significant opportunities to accelerate the construction time of buildings. The 
introduction of these systems is also guaranteed to create conditions for improving the 
energy efficiency of buildings. External self-bearing walls in frame systems, as a rule, 
support on the edges of the floor disks, while the columns of the external row frame 
are located in the thickness of the external walls, which can be either single-layer of 
cellular stones or specially designed small-piece multi-layer reinforced concrete blocks 
with high heat transfer resistance. In this case, the walls can be arranged simultaneously 
with the erection of the frame and used as formwork and scaffolding when external 
girders concreting. It also helps to ensure the joints tightness of the walls with floors 
and allows you to accelerate the construction speed. When using hinged three-layer 
panels, a decrease in the rate of external wall installation can be observed. 

Modern structural systems of buildings also contribute to the wide production 

industrialization of their individual elements in precast concrete plants, leading to 