necessary to fulfill the demand for PPE). 

L (X) → max – number of PPE of each type by the work performed. 
For an example, let us take the work during one shift for 8 hours for 5 days. 
The total working time fund is: 320000 (hours) per month. 
1)

 

We determine the normalized time (labor hour) for the implementation of 

labor actions for each PPE (per month) - the complexity of recording the "Average" 
option (set of options) in the use of PPE for example: 

0,3 X1 + 0,3X2 +0,45 X3 ≤ 4360 

0,3

∙20∙8+0,3∙20∙12+0,45∙20∙22=318∙400=127200. 

The coefficients of 0,3 and 0,45 are selected according to the sectoral documents 

in accordance with the norms of labor intensity, labor hours for antenna-mast 
specialists, from questionnaires, and on average, when performing work for 0,3-20 
minutes - when performing work using overalls; then the next factor is 0,3-20 min – 
this is the so-called "cross" discrete coefficient, because it is impossible to do work 
without shoes and, 0,45-26 min, when using the means of protection. Therefore, 
everything is reduced to labor costs and time expenditures. 

2) Second limitation on productivity (labor capacity): 

X1 + X2 + X3 ≤ 336000 

X1 + X2 + X3 ≤ 64000 + 96000 + 176000≤ 336000. 

Productivity of work is the number of operations equaled to the labor hour 

(64000/320000) = 32. 

Accordingly, the production activities at X1 will demand spending of x1 / 32 

time (hours) of the total time fund, – X2 / 72; X3 / 242. 

The desired restraint in time funds after the conversion is: 

0,031 X1 + 0,014 + 0,0041 X3 ≤ 320000. 

Also, let us take into account that with the reduction in the number of workers, a 

smaller number of jobs will be performed. For example, in May X1 = 384 (64000/400 
= 9830400). Since the remainder of PPE at the end of the month is, for X1, X2, X3, 
respectively, n items, and it is necessary to consider the cost of overcurrent, then it is 
also necessary to calculate the costs (if you use the tabular form, then they will be 
added to the total costs in the tables when converting the productivity (labor capacity) 
of jobs by months). 

Target function: L (X) = X1 + X2 + X3 → max, i.e., the criterion for solving 

efficiency (in the distribution of redundant workers), choose the maximum possible 
amount of use for 3 types of PPE in the execution of jobs on the installation, repair of 
towers, antennas with the restriction of the work of each type and the cost of the jobs 
labor capacity, workers productivity. For the given model, it is possible to make a 
calculation in the simplex table of the optimal plan of jobs execution at the PPE fund, 
and to find out what set (amount) should be used at the maximum of the performed 